IBR IMB-im2 Instruction Manual page 19

Imbus measuring bus
Table of Contents

Advertisement

Instruction Manual
3. General information for IMB-pb modules
The IMB-pb modules read continuously the actual measuring values of the connected IMB measuring
-
modules and provide them on the Profibus.
-
On the delivered Support-CD there is the programme IMB-PB_Setup.EXE for setting the Profibus and
for firmware update of IMB-pb modules as well as the GSD-file.
!!! The attached 1-to-1 cable does NOT serve for Profibus communication. It is for configuration of IMB-pb modules !!!
-
On the communication with a Siemens PLC and data packets > 4 Byte the communication must occur
with SFC14 & SFC15.
-
With the IMB_Test programme no communication is possible with IMB-pb modules.
Because of this there is an additional IMB-usb / IMB-232 cable for the configuration of the IMB
measuring modules ( which are connected to IMB-pb module ) necessary.
4. IMB-PB_Setup.EXE ( Configuration-Software for IMB-pb modules )
1.
Connect the IMB-pb connection module over the configuration interface by 1-to-1-cable in delivery to
the COM-Port of the PC.
2.
Start of die Software „IMB-PB_Setup.EXE" from Support-CD in delivery. ( An installation of the soft-
ware is not necessary. )
3.
Select the COM-Port and the file with the new firmware or the Profibus-Address ( Profibus-ID ).
!!! A Firmware-Update is only necessary for special applications and must be clarified with manufacturer.
!!! If the Addr. 126 is programmed, then the Profibus Master can assign the Profibus-ID to the IMB-pb.
4.
Press button „Start Programming" and follow the instructions.
IMBus
Measuring modules
Configuration-
interface
19
Profibus-
Profibus-
Error-LED
Connection
Power supply

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for IBR IMB-im2

Table of Contents