Leakage Detection; Heat Insulation - Vivax HPS-22CH65AERI/O1 R32 User Manual

Table of Contents

Advertisement

Available languages

Available languages

ENG
Leakage Detection 
Use soap water or leakage detector to check every joint whether  leak or not (Refer to 
Fig.7‐2 ). 
Note:  
A is high pressure side stop valve 
B is low pressure side stop valve 
C and D is connecting pipes interface of indoor and outdoor units 
Heat Insulation 
Do  the  heat  insulation  to  the  pipes  of  gas  side  and  liquid  side  separately.  The 
temperature  of  the  pipes  of  gas  side  and  liquid  side  when  cooling,  for  avoiding 
condensation please do the heat  insulation fully.   
1) The gas side pipe should use closed cell foamed insulation material, which the fire‐
retardant is B1 grade and the heat resistance over 120  . 
2) When  the  external  diameter  of  copper  pipe≤Φ12.7mm,  the  thickness  of  the
insulating layer at least more than 15mm; When the external diameter of copper
pipe≥Φ15.9mm, the thickness of the insulating layer at least more than 20mm. 
3) Please  use  attached  heat‐insulating  materials  do  the  heat  insulation  without
clearance for the connecting parts of the indoor unit pipes. 
Check point of indoor unit
Check point of outdoor unit
The unit body
 
 
Fig. 7‐2
Cut from upward
Site pipe side
Affiliated heat pump belt
 
Fig. 7‐3
19 
-
VIVAX
 
 
 
 
 

Hide quick links:

Advertisement

Chapters

Table of Contents
loading

Table of Contents