G Unit Overview - Bradford White Laars Linc MagnaTherm FT CFH1000 Installation And Operation Instructions Manual

Table of Contents

Advertisement

Page 10

1.G Unit Overview

Pressure
Transmitters
Field
High Voltage Panel
Electrical
Connections
NOTE: Field Wiring and Main
Power Wiring should only enter
at the rear of the boiler and at
these electrical boxes.
The top covers must remain
removable for routine service.
See Section 7.B on page 38
Shown with front doors and side panels removed.
Blower
Heat Exchanger
Control Panel
On all models, the Control Panel hinges forward for
easy access to wiring and to the heat exchanger.
Water Outlet
Field
Connections
Main Power
Connections
Vent
Water Inlet
LAARS Heating Systems
Gas Supply
Connection
Air Intake
and Filter
Condensate
Trap
Electrical
Conduit
for Field
Wiring

Advertisement

Table of Contents
loading

Table of Contents