Download Print this page

Backyard Discovery Atlas 2002142 Assembly Instructions And Owner's Manual page 38

6 foot deck

Advertisement

Place the set on level ground, not less than 6 feet from any structure or obstruction such as a fence,
garage, house, overhanging branches, laundry lines or electrical wires.
Adventure
Olympian
5' Deck
6' Deck
27'- 2"
A
27'- 2"
B
26'- 0"
26'- 0"
2 pos
B
28'-11"
28'-11"
3 pos
B
31'-11"
31'-11"
4 pos
C
14'- 0"
14'- 0"
2 pos
C
16'-11"
16'-11"
3 pos
C
19'-11"
19'-11"
4 pos
D
13'- 2"
13'- 2"
E
13'- 2"
12'- 2"
F
9'- 0"
8'- 0"
Important Assembly Notes
1) PRE-SORT ALL STEPS BEFORE BEGINNING ASSEMBLY. Pay close attention to the ITEMS
NEEDED FOR EACH STEP. Assembly is easier when the wood and hardware are sorted by step.
2) While assembling unit, take time before and after each step to make sure
Fort is level. If fort is not level, assembly will be difficult and improper assembly
may result. Extra care must be taken to assure the fort is square on the steps
that include this symbol.
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
4) Whenever a T-nut is used, follow these directions: Place T-nut in
pre-drilled hole. Tap in with hammer. Place bolt with split and flat
washers in the opposite side. Hand tighten to make sure the bolt
is in the T-nut. DO NOT over tighten.
5) Pay close attention to make sure you are using the correct hardware
in the correct steps. Using incorrect hardware may result in improper assembly.
6) Read the instructions of each step thoroughly. The written steps may include important information not
shown in the illustrations.
Basic Setup Dimensions
Titan
7' Deck
27'- 2"
26'- 0"
28'-11"
31'-11"
14'- 0"
A
16'-11"
19'-11"
13'- 2"
14'- 2"
10'- 0"
3) When installing a board on the small face of a 2x4, pre-drilling the
attachment hole is REQUIRED. Using the holes in the board as a
guide, drill holes into the 2x4 with an 1/8" drill bit. Failure to pre-drill
may result in board splitting.
Recommended Play Area with Fort
Overall Height - E
Single Beam Height - F
B
C
Note: It is vital that the fort
be level before and
!
after each phase of
assembly.
D
SPIKES
TOWARDS
WOOD

Advertisement

loading