Daikin SkyAir RZR-P Series Engineering Data page 148

Cooling only 60hz, heat pump 60hz, r-410a, inverter
Hide thumbs Also See for SkyAir RZR-P Series:
Table of Contents

Advertisement

EDUS281120_a
Transmission
Control box
terminal block (6P)
Clamp (4)
Insulating tube (11)
Control box
Control box lid
lid securing screw (2pcs.)
power supply
How to connect power supply
terminal block (2P)
Fastener
Power supply wire
Clamp (4)
Fastener
Transmission
terminal block (6P)
Transmission wire
In the insulating tube (11), it can let the remote controller wire
and transmission wire pass to 2.
WARNING
Never connect power supply wiring to the terminal block for
remote controller wiring as this could damage the entire system.
Use only specifi ed wire and connect wires to the terminal
tightly. Be careful wires do not place external stress on ter-
minals. Keep wires in neat order so as to not obstruct other
equipment. Make sure that the electric box lid fi ts tightly.
Incomplete connections could result in overheating and, in
worse case, result in electric shock or fi re.
NOTE
1. Use round crimp-style terminals for connecting wires to the
power supply terminal block.
If unavailable, observe the following points when wiring.
Do not connect wires of different gauge to the same
power supply terminal.
(Looseness in the connection may cause overheating.)
English
RZR-P, RZQ-P(9)
Refer to Fig. 27
Power supply
Remote controller wire
terminal block (2P)
and transmission wire
Ground terminal
Power supply wire
Gas pipe
Liquid pipe
Conduit
Corking or Putty
Resin bush (10)
L
L
1
2
POWER SUPPLY
Fig. 26
Clamp (4)
Ground wire
After securing the
cramp material
to the bracket,
cut off any extra
material.
Remote controller wire and
transmission wire
Fig. 27
P 1 P 2 F 1 F 2 T 1 T 2
REMOTE
TRANSMISSION
FORCED
CNTRL
WIRING
OFF
Clamp (4)
Insulating
tube (11)
1 in.
Remote controller wire
Fig. 28
Use the specifi ed electric wire. Connect the wire securely to
the terminal. Lock the wire down without applying excessive
force to the terminal. (Tightening torque: 0.97 ft lbf ±10%)
Attach insulation sleeve
Round crimp-style terminal
Drain pipe
2. Tightening torque for the terminal screws.
Use the correct screwdriver for tightening the terminal
screws. If the blade of screwdriver is too small, the head
of the screw might be damaged, and the screw will not be
properly tightened.
If the terminal screws are tightened too hard, screws
might be damaged.
Refer to the table below for the tightening torque of the
terminal screws.
Table 4
Terminal
Transmission terminal block (6P)
Power supply terminal block (2P)
Ground terminal
3. Do not connect wires of different gauge to the same ground
terminal. Looseness in the connection may deteriorate pro-
tection.
4. Outside of the unit, keep transmission wire at least 5 in.
away from power supply wire. The equipment may malfunc-
tion if subjected to electrical (external) noise.
5. For remote controller wire, refer to the "INSTALLATION
MANUAL OF REMOTE CONTROLLER" attached to the
remote controller.
9-2
WIRING EXAMPLE
Fit the power supply wire of each unit with a switch and fuse
as shown in the drawing.
COMPLETE SYSTEM EXAMPLE
Power supply
Main
switch
Indoor unit
Remote controller
Installation of indoor unit
Electric wire
Connect wires of the
same gauge to both side.
Tightening torque
Size
M3.5
0.58 – 0.72
M4
0.87 – 1.06
M4
0.87 – 1.06
Power supply wire
Outdoor unit
Transmission wire
Switch
Fuse
(ft-lbf)
11
C: 3PN06240-12Q