9-4 Computerized control (forced off and on/off operation)
(1) Wire specifications and how to perform wiring
• Connect the input from outside to terminals T1 and T2 of the terminal block for remote controller.
Wire specification
Gauge
Length
External terminal
(2) Actuation
• The following table explains FORCED OFF and ON/OFF OPERATIONS in response to Input A.
FORCED OFF
Input "ON" stops operation (impossible by remote controllers.) Input OFF → ON turns ON unit.
Input OFF enables control by remote controller.
(3) How to select FORCED OFF and ON/OFF OPERATION
• Turn the power on and then use the remote controller to select operation.
9-5 Centralized control
• For centralized control, it is necessary to designate the group No. For details, refer to the manual of each
optional controllers for centralized control.
10. INSTALLATION OF THE DECORATION PANEL
<If performing a test run without attaching the decoration panel, read "11. FIELD SETTING" and "12. TEST
RUN" first.>
Refer to the installation manual attached to the decoration panel.
After installing the decoration panel, ensure that there is no space between the unit body and decoration panel.
Note:
Since the electric insulation sheet stacked to the control box cover gets sandwiched between the unit body and
decoration panel, when closing the cover, slip the insulation sheet between them first and then attach the cover
to the control box.
English
RZR-P, RZQ-P(9)
F2
T1
T2
FORCED
OFF
AWG18 -
Max. 328ft.
Contact that can ensure the minimum applicable load of 15 V DC, 1 mA.
Input A
ON/OFF OPERATION
Input ON → OFF turns OFF unit.
Installation of indoor unit
23
3P161684-6K