Installing The Pump - Getinge Arjohuntleigh NIMBUS 3 Instructions For Use Manual

Hide thumbs Also See for Arjohuntleigh NIMBUS 3:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Additional Checks on
the Nimbus 3
Professional Mattress
Installing the Pump 1. If the pump is to be hung from the end of the bed,
1. Make sure that all 16 Vent Valves are closed.
Closed
2. Make sure that the Head Section Deflate Control is
set to
Dynamic (Normal) Mode
TriCell Head Section Deflate
Dynamic (Normal) Mode
make sure that the bed bracket is securely attached
to the pump, and then attach the pump and bed
bracket to the bed frame.
2. Alternatively the pump can be placed underneath
the bed, either upright or lying on its back.
3. Insert the connector on the end of the mains power
cord into a suitable mains power outlet.
9
Open
.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Arjohuntleigh NIMBUS 3 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Arjohuntleigh nimbus 3 professional

Table of Contents