8. Torque the tie rods to 200 ft lbs (271 Nm). Follow the tightening pattern on the label.
Afterwards, be sure to position leveling screw back to starting position. Typical to count and record
rotations when tightening. Use the recorded values from disassembling procedure.
9. Check all the flow directions on the check valves to identify the Inlet and Outlet Check Valves.
10. Check all connections to prepare to start.
Checklist for Inspection and Preventative Maintenance
Haskel Q Drive
Safety Inspection and Preventative Maintenance
Serial Number:
1. Inspection – Lockout Power! Risk of Electrical Shock!
1.1
External surfaces is free of damage and secure.
1.2
Control panel is free of damage and legible.
1.3
All labels are legible and secure.
1.4
Power switch is functional and secure.
1.5
Vents are free of damage and unobstructed.
1.6
Connections are tight and straight.
2. Gas Sections
2.1
Barrel
2.2
Piston
2.3
Piston seal
2.4
Check Valves
2.5
Tie Rods
2.6
Leveling
3. Servo Actuator
3.1
Oil level is visible.
Comments
Q-Drive Installation, Operation, and Maintenance Manual
Performed By:
35 of 59
Date:
Pass
Fail
Pass
Fail
Pass
Fail