1.13 BOILER CLEARANCES AND CONNECTIONS

The following minimum clearances must be
maintained for operation and servicing.
Front of boiler - 450mm
Sides of boiler - 25mm
Above boiler - dependent upon the flue
system see drawings
Below boiler - 300mm
Clearance between multiple boiler
installations - 25mm
GAS & CONDENSE OUTLETS
FLOW &RETURN CONNECTIONS
12