Packaging Removal; Unpacking - Keston HEAT 2 45 Installation & Servicing

Table of Contents

Advertisement

2.2 PACKAGING REMOVAL

1. The boiler should be laying on its back with
the straps removed.
2. Carefully read the installation instructions
before proceeding.
3. Remove the outer packing sleeve.
4. Remove the protective cardboard wall
mounting template from the front of the
boiler.
5. Remove the packing piece from the top of
the boiler.
6. Check the contents against the list in
Section 2.3 'Unpacking'. Note: some items
are contained within the top packing piece.
7. The boiler may now be stood on its base,
with the cardboard bottom packing piece
still in place to protect the connections.
Due care should be taken when standing
up the boilers, with respect to their
weights, see Table 2 on page 6.

2.3 UNPACKING

The boiler is supplied fully assembled in one pack.
When unpacking the boiler check the contents against the items below.
Do not dispose of the packaging until all contents are accounted for, as some parts are held within the cardboard packing pieces.
Boiler
x1
Connector Kit
x1
ACCESSORY BOX
Ball Valve
M1 Tee
x2
x2
Terminals
Wall plate
x1
x2
Installation & Servicing
SECTION 2 - INSTALLATION
Wall Mounting Template
x1
Wall Mounting Bracket
x1
Pressure Relief Valve
Brass Union
x1
x1
Wall Seal
Flue Sleeve
x1
x1
3
4
Installation Guide
x1
x2
User Guide
Hex Head Coach Screws
x1
Log Book
x6
Wall Plugs
x1
Warranty
x1
x6
Drain Cock
Weather Compensation
x1
x1
5
7
Grommet
Condensate Trap
x1
Gas Cock
x1
Wood Screws
Wall Plugs
x4
x4
15

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Heat 2 55Heat 2 45pHeat 2 55p

Table of Contents