Installation Instructions - Assa Abloy Corbin Russwin SE LP10 MP9800 Series Installation Instructions Manual

Integrated wiegand with and without melr option
Table of Contents

Advertisement

SE LP10 Integrated Wiegand
With and Without MELR Option (Electric Latch Retraction)
1 Door Preparation
A. Verify Hand and Bevel of Door
• Check hand of door. The Multi-Point lock may be handed.
• Door should be fitted and hung
• Verify box label for size of the Multi-Point lock, function
and hand
• Change hand (if necessary)
B. Door Preparation
Prepare door according to appropriate template. If necessary,
refer to www.corbinrusswin.com.
• Metal door (MD/AD) FM438
- Template: T31242
• Wood door (WD) FM436
- Template: T31243
2 Rod and Inner Case Installation
1. Refer to instruction sheet FM438 for rod and inner
case installation on metal doors.
2. Refer to instruction sheet FM436 for rod and inner
case installation on wood doors.
Copyright © 2018 Corbin Russwin, Inc., an ASSA ABLOY Group company.
All rights reserved. Reproduction in whole or in part without the
express written permission of Corbin Russwin, Inc. is prohibited.

7) Installation Instructions

10
Inside
Left Hand
Reverse
Outside
LHR
Fig. 1A
Fig. 1B Metal Door Shown
Fig. 2
Right Hand
Reverse
RHR

Advertisement

Table of Contents
loading

Table of Contents