Moving E44 and E45(Standing position) Frames
40
Lift and Move Instructions
6. Place the load frame carefully into position.
7. Remove the lifting straps from the top plate, and any protective padding, if
used.
When the frame is in its testing location, you can proceed with the installation
process.
Do not exceed 30
Lifting Load Frame with a Crane
°
MTS Exceed™ Series 40 Site Preparation Guide
Crane Hook
Lifting Sling
Hoist Ring
Load Frame