MTS Systems Exceed 40 Series Site Preparation Manual page 37

Hide thumbs Also See for Exceed 40 Series:
Table of Contents

Advertisement

MTS Exceed™ Series 40 Site Preparation Guide
The frame may overturn suddenly when lifting the frame.
An overturned frame can cause injury or death to anyone in the immediate
area.
Ensure that all persons in the immediate area are standing away from the
frame during lifting. Do not lift the frame more than 8 cm (3 in) off the floor.
4. Slowly and carefully lift the frame off the floor.
5. Move the frame to its operating location.
6. Slowly lower the frame to the floor.
7. Remove the shipping skid, insert the leveling wedge iron, and position the
frame. Follow the instructions described under
38.
When the frame is in its operating location, you can proceed with the installation
process.
Load Frame
Shipping Bolt
Shipping Skid
Lifting the Frame from the Base
Moving E44 and E45(Standing position) Frames
WARNING
"Crosshead method"
Lift and Move Instructions
on page
Forklift Arm
37

Advertisement

Table of Contents
loading

Table of Contents