Moving E43 Double-Column Frames
Procedure
34
Lift and Move Instructions
To unpack and position the E43 load frame:
1. Move the load frame, to its final location within your building. Use a forklift
to transport the container from the shipping dock to the final location..
2. Unpack the load frame ,remain the frame still in the shipping material,.
3. Remove the shrink wrap vapor barrier encasing the load frame.
4. Remove the fixed wood blocks around the machine.
5. Use the packing list to inventory all the items. Accessories may be in the
container with the load frame or may be packaged separately.
Do not open any of the packing boxes. The packing list will indicate the
total number of boxes that are included in the shipment. Count the number
of boxes you received to make sure you have the correct number of boxes.
Do not open these boxes until the MTS service representative arrives to
install your testing system. This ensures that no parts are lost prior to
installation.
6. Position the frame into its operating location.
If you use the Frame base method to lift and position the frame into its
operating location, see
If you use the crosshead method to lift and position the frame into its
operating location, see
When the frame is in its operating location, you can proceed with the installation
process.
"Frame base method"
on page 36 for details.
"Crosshead method"
on page 38 for details.