Moving E44 and E45(Standing position) Frames
Transporting
procedures
Frame base method
36
Lift and Move Instructions
1. Move the load frame, to its final location within your building. Use a forklift
to transport the container from the shipping dock to the final location..
2. Unpack the load frame ,remain the frame still in the shipping material,.
3. Remove the shrink wrap vapor barrier encasing the load frame.
4. Use sapnner wrench dismantle the connection bolt between load frame and
shipping skid.
5. Use the packing list to inventory all the items. Accessories may be in the
container with the load frame or may be packaged separately.
Do not open any of the packing boxes. The packing list will indicate the
total number of boxes that are included in the shipment. Count the number
of boxes you received to make sure you have the correct number of boxes.
Do not open these boxes until the MTS service representative arrives to
install your testing system. This ensures that no parts are lost prior to
installation.
6. Position the frame into its operating location.
If you use the Frame base method to lift and position the frame into its
operating location, see
If you use the crosshead method to lift and position the frame into its
operating location, see
If you use the crane method to lift and position the frame into its
operating location, see
When the frame is in its operating location, you can proceed with the installation
process.
There are three methods for transporting the load frame to the test site:
Frame Base method—use a forklift to lift the upright load frame from
underneath the base with the shipping skid still attached.
Crosshead method—use a forklift with padded forks to lift the load frame
from under the crosshead.
Crane method—use a crane to lift the upright load frame from the
crosshead. If this method is used, MTS recommends using professional
riggers experienced in moving heavy equipment.
To transport the load frame using the frame base method:
1. Ensure that the frame is bolted to the shipping skid.
2. Carefully insert the forks under the shipping skid.
3. The crosshead should be in its lowest position so that the frame is not top
heavy.
"Frame base method"
on page 36 for details.
"Crosshead method"
on page 38 for details.
"Crane method"
on page 39 for details.
MTS Exceed™ Series 40 Site Preparation Guide