www.ti.com
Description
Chip Select
Serial Clock
Reserved
Frame Sync
Reserved
Reserved
Serial Data Out
BUSY
Convert Start
Power down
4
Power Supplies
The EVM accepts four power supplies:
• A dual ±Vs dc supply for the dual-supply operational amplifiers. The maximum recommended voltage
is ±12 Vdc.
• A single +5-Vdc supply for the analog section of the board (A/D + Reference).
• A single +5-Vdc or +3.3-Vdc supply for the digital section of the board (A/D + buffers).
There are two ways to provide these voltages. The first way is to connect the voltages to the test points
listed in
Table
4.
Test Point
Signal
TP1
+VA
TP2
–VA
TP3
+BVDD
TP4
+AVCC
The second way is to use the power connector J2 and derive the voltages elsewhere.
pinout for J2. If using this connector, set W1 jumper to connect +3.3VD or +5VD from J2 to +BVDD. Shunt
pins 1-2 to select +5VD, or pins 2-3 to select +3.3VD as the source for the digital buffer voltage supply
(+BVDD).
SLAU146 – December 2004
Table 3. Pinout for Serial Control Connector P2
Signal Name
Connector Pin
CS
P2.1
P2.2
SCLK
P2.3
P2.4
N/A
P2.5
P2.6
FS
P2.7
P2.8
N/A
P2.9
P2.10
N/A
P2.11
P2.12
SDO
P2.13
P2.14
BUSY
P2.15
P2.16
CONVST
P2.17
P2.18
PD
P2.19
P2.20
Table 4. Power Supply Test Points
Description
Connect +12-Vdc supply for amplifier
Connect –12-Vdc supply for amplifier
Apply +3.3 Vdc or +5 Vdc. See ADC data sheet for full range.
Apply +5 Vdc
Table 5. Power Connector J2 Pinout
Signal
+VA(+12V)
+5VA
DGND
N/C
+3.3VD
Signal Name
Description
SB/2C
Straight binary or 2s complement output
DGND
Ground
N/A
Reserved
N/A
Reserved
N/A
Reserved
N/A
Reserved
N/A
Reserved
N/A
Reserved
DGND
Ground
N/A
Reserved
J2 Pin
Signal
1
2
–VA(–12 V)
3
4
N/C
5
6
AGND
7
8
N/C
9
10
+5VD
Power Supplies
Table 5
gives the
ADS8380EVM
5
Need help?