Operation - Daily Routines; Preliminary Work; Preliminary Checks; Starting - tecan GENESIS FE500 Quick Manual

Table of Contents

Advertisement

   )( Quick Guide

Operation - Daily Routines

For detailed instructions, refer to the    )( Operator's
Manual, p/n 391
400.
Safety Instructions
The Safety Instructions must strictly be followed. Refer to
Chapter: Safety Instructions on page 3
structions in the corresponding chapters in the    )(
Operator's Manual, p/n 391 400.

Preliminary Work

Preliminary Checks

Ensure that the Daily Preventive Maintenance upon shut-
ting down the System is done.
Ensure that all Containers for Disposables are refilled and
all wastes are emptied. Refer to the corresponding des-
cription in the
Chapter: Refilling and Disposal on page
Make sure four Centrifuge Buckets are placed on the
Worktable, correctly oriented. Check also the Buckets in
the Centrifuge.
Check the orientation of the Buckets on the Worktable and
in the Centrifuge.
Ensure that all doors, the drawers and the front Panel are
closed.
and to the special in-
21.

Starting

CAUTION
Turn-off all cell phones and pagers.
Before starting, make sure that the Daily Main-
tenance has been carried out properly. Refer to
the    )( Operator's Manual, p/n 391 400.
After switching off the instrument, wait a mini-
mum of 10 seconds before starting it again.
1
If necessary, refill DiTi, Secondary Tubes, Labels, and
empty the Wastes.
2
Switch on the power on the right side of the instrument
3
Start the Application Software. After starting, the instru-
ment will initialize.
Preliminary Work
1
n
.
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents