Husqvarna 125C Workshop Manual page 20

Brushcutter, trimmer
Hide thumbs Also See for 125C:
Table of Contents

Advertisement

Fuel system
Dismantling the carburettor
Remove the control diaphragm and
check for damage.
Replace if required.
Pressure test the metering unit.
531 03 06-23
In the event of leakage – remove the
needle valve.
Dismantling the carburettor
Carefully remove the control diaphragm
(A) and gasket (B).
Check the diaphragm for holes and
wear on the pin (C).
Replace the diaphragm if required.
Connect the pressure tester 531 03 06-
23 to the fuel hose nipple that is
inserted into the body of the
carburettor.
Lower the carburettor in a vessel with
petrol in order to discover any leaks
more easily.
Test the pressure at 50 kPa.
No leakage is permitted.
In the event of leakage – remove the
needle valve.
Loosen the bolt and remove the lever
arm, axle, needle valve and spring.
3
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

125l

Table of Contents