Migration Of The Project; Preparatory Steps - Siemens SIMATIC S7-300 Manual For Migrating

Tia portal
Hide thumbs Also See for SIMATIC S7-300:
Table of Contents

Advertisement

5 Software Conversion
Note
An action package for field PGs is available that is specifically designed for
migrations, which can be performed with the migration tool: The package does
not include STEP 7 V5.x or WinCC flexible licenses. The article number is:
6ES7716-2CA10-0CD4
5.2

Migration of the project

5.2.1

Preparatory steps

Before the actual migration of the project can be carried out, some points have to
be checked and, if required, changed.
Note
A migration of the project is only possible as of STEP 7 V5.4 SP5. However, you
can convert projects that have been created with an older version. To do this,
open the project with STEP 7 V5.4 SP5 or higher and perform a consistency
check of the blocks incl. compilation.
Table 5-5
Step
1.
Check whether the required software packages have been installed and licensed for STEP 7
V5.x or TIA Portal. See
2.
Check the project structure of your STEP 7 V5.x project. Multi-projects cannot be migrated as
a whole. To do this, each individual project has to be used.
3.
Check whether the project includes WinCC flexible or WinCC stations. If only the STEP 7 part
is to be migrated, you have to remove the other stations from the project.
4.
Check whether the components included in the STEP 7 V5.x project can be migrated. To do
this, use the Readiness Check Tool.
Note: Modules/stations that are connected via GSD file can be migrated in any case, since
GSD files are automatically installed in the TIA Portal
Migration S7-300/S7-400 nach S7-1500
Entry ID: 109478811,
V1.1,
chapter 5.1.2
05/2017
Instruction
44

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Simatic s7-400Simatic s7-1500

Table of Contents