5 Software Conversion
Step
7.
Select the appropriate initial project.
(Note the tick on "Include hardware configuration")
8.
Check the result of the migration process with the migration protocol.
9.
If necessary, adapt the project.
10.
Compile the migrated project.
11.
If required, rectify the fault.
5.2.3
Migrating projects with safety program
Without compilation
When you are converting a project that contains a failsafe CPU, you can carry out
the migration just as for a standard program. You will get a complete STEP 7
Migration S7-300/S7-400 nach S7-1500
Entry ID: 109478811,
V1.1,
Instruction
05/2017
50