Festo CPV Series Brief Description page 13

Valve terminal with installation local bus connection
Hide thumbs Also See for CPV Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 11
CP-IL-...
3
Fitting the connecting cables
3.1 Preparing the cables
Brief instructions are supplied with the QUICKON set (order no.
175485). Please follow the instructions on preparing the cables.
You can then be sure that you have created a reliable contact.
3.2 Connecting the cables
After preparing the cables proceed as follows:
1. Connect the prepared cables to the appropriate connections
of the valve terminal (Bus IN; Bus OUT; 24 V).
2. Turn the cable until the coded noses fit into the grooves. The
codes ensure the correct polarity.
3. Tighten the union nuts. The ends of the cores will then be
pressed into the piercing device and the insulation will be
cut. Reliable electrical contact will then be made.
0002a
13

Advertisement

Table of Contents
loading

Table of Contents