Installation When Using Light Gas; Installation And Operating; Installation; Operation With Additional Devices - GEV FMG 1350 User Manual

Radon detector
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 12
User manual
4.2

Installation when using light gas

1. Drill 2 mounting holes at a distance of 32 mm at a suitable position shown
below.
2. Insert the dowels into the drilled holes.
3. Screw the wall bracket into the dowels using the 2 screws.
4. Hang the device on the hook of the wall bracket.
Installation place
5

Installation and Operating

WARNING
CAUTION
5.1

Installation

5.1.1 Operation with additional devices

1. Match the specifications of the device to be operated to ensure compatibility.
2. Additional devices operating at 80-230 V~, such as fans, connect to OUT1 and
OUT2.
3. Connect the power cable to an easily accessible, preferably separately pro
tected, socket.
The device starts the self-test mode. The red alarm LED flashes once and a beep
sounds. After that, the green operating LED flashes for a maximum of 3 minutes
every second. During this time, the device determines the room air condition. If the
green LED is lit continuously, the device is ready for operation and monitors
the room air.
18
BA_Radonmelder_001350.indd 18
Explosion, Electric shock!
Drilling work can damage lines in wall mounting.
Pay attention to lines lying in the wall that carry electricity, gas
or water and do not damage them!
Stumbling, fall
Cables can be overlooked.
Lay the power cable in such a way that it does not hinder
anyone or damage anything.
3
26.03.2018 14:25:29

Advertisement

Table of Contents
loading

Table of Contents