EN
APPLICATOR OPERATION
1. Set fluid pressure using flow regulator.
1
2. Disconnect the air to the applicator.
OR...
AH-17-02-R1 (10/2019)
OPERATION
6.9 bar (100psig) Max
2
1 - Fluid Supply
2 - Flow Regulator
3. Activate trigger to start material stream into grounded
metal bucket or suitable area.
!
The bucket or area sprayed into must be
grounded to true earth ground.
4. Release trigger stop material flow.
20 / 55
OPERATION
WA R N I N G
www.carlisleft.com