ABB REL 551 2.3 Series Installation And Comissioning Manual page 8

Line differential protection terminal
Table of Contents

Advertisement



2
Introduction to the installation and
commissioning manual
,QWURGXFWLRQ WR WKH LQVWDOODWLRQ DQG FRPPLVVLRQLQJ
PDQXDO
$ERXW WKH FRPSOHWH VHW RI PDQXDOV IRU D WHUPLQDO
The complete package of manuals to a terminal is named users manual (UM). The 8V
HUV PDQXDO consists of four different manuals:
Application
manual
7KH $SSOLFDWLRQ 0DQXDO $0 contains descriptions, such as application and func-
tionality descriptions as well as setting calculation examples sorted per function. The
application manual should be used when designing and engineering the protection ter-
minal to find out when and for what a typical protection function could be used. The
manual should also be used when calculating settings and creating configurations.
7KH 7HFKQLFDO 5HIHUHQFH 0DQXDO 750 contains technical descriptions, such as
function blocks, logic diagrams, input and output signals, setting parameter tables and
technical data sorted per function. The technical reference manual should be used as a
technical reference during the engineering phase, installation and commissioning phase
and during the normal service phase.
7KH 2SHUDWRUV 0DQXDO 20 contains instructions on how to operate the protection
terminal during normal service (after commissioning and before periodic maintenance
tests). The operator´s manual could be used to find out how to handle disturbances or
how to view calculated and measured network data in order to determine the reason of
a fault.
7KH ,QVWDOODWLRQ DQG &RPPLVVLRQLQJ 0DQXDO ,&0 contains instructions on how to
install and commission the protection terminal. The manual can also be used as a refer-
ence if a periodic test is performed. The manual covers procedures for mechanical and
electrical installation, energising and checking of external circuitry, setting and config-
uration as well as verifying settings and performing a directionality test. The chapters
and sections are organized in the chronological order (indicated by chapter/section
numbers) the protection terminal should be installed and commissioned.
Technical
Installation and
reference
commissioning
manual
manual
&KDSWHU 
,QWURGXFWLRQ
Operator´s
manual
en01000044.vsd

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rel 531

Table of Contents