Operation Of Crane Assembly - Barbco TRIBOR Series Operation Manual

Table of Contents

Advertisement

OPERATION OF CRANE ASSEMBLY:

The TriBor has an optional full function crane assemble. Unit is located above the breakouts.
Perfect for loading and unloading drill pipe or pilot rod.
BATTERY
DISCONNECT
Powering up the crane- The umbilicals are connected and the engine is running.
1- Turn the battery disconnect switch to the ON position.
2- Turn the crane power switch to the ON position.
3- Turn the hydraulic valve for the crane to the ON position.
4- Push the e-stop in and then twist it clockwise to release it. This will boot up the remote.
The crane is ready to operate.
36
HYDRAULIC
LEVER
CRANE POWER
SWITCH
Operation

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tribor 48Tribor 36

Table of Contents