OPERATION OF BREAKOUT ASSEMBLY:
1- Make sure the Breakout assembly is properly locked into the track. All four pins are
engaged.
2- Connect all umbilical hoses between the power pack and breakout assembly.
CAUTION! EQUIPMENT HAZARD!
connected or all the hoses must be disconnected . Never make umbilical connections when the
engine is running.
3- The front and rear clamping valve sections have friction hold capabilities. This allows for
constant pressure against the tool joints.
Adjusting the clamping pressure-
4- Close one of the clamp sections. The set pressure will be displayed on the hydraulic
gauge.
5- Turn the pressure adjustment knob clockwise to increase the pressure. Turn the knob
counter-clockwise to decrease the pressure.
NOTE- You may need to place the valve in the neutral position to make an adjustment.
To start the engine either all the hoses must be
Operation
35