Maintenance For Shore Power Cable Set & Shore Power Inlets; Servicing The Main Distribution Panel; To Replace A Faulty Component On The Main Distribution Panel - Sea Ray 52 Sundancer Owner's Manual

Table of Contents

Advertisement

S
4.
Slide upper source selector to the left to
expose the two (2) breakers marked SHORE.
By pushing the two (2) breakers up you will
be supplying 220 volts of AC power through
the AC MDP to only the LINE 1 side.
To supply power to the LINE 2 side of the AC MDP,
repeat steps 1 through 4.
NOTE: Keep in mind that each shore power cord
will only feed its respective loads on the panel.
T
:
O USE THE GENERATOR
1.
Start the generator by following the generator start-
up procedures in Section 3 - Using Your Boat , page
3.8 or in your generator owner's manual.
2.
Once the generator is started, slide upper
source selector to the right to expose the two
(2) breakers marked GENERATOR and push
the two (2) breakers up to energize LINE 1.
3.
To energize LINE 2, repeat step 2 on the LINE
2 side.
G. M
AINTENANCE FOR
C
S
& S
ABLE
ET
HORE
!
WARNING
Disconnect the power cable from power source before
performing maintenance.
The metallic parts of your cable set and inlet are
made to resist corrosion. In salt water environment,
life of the product can be increased by periodically
wiping the exposed parts with fresh water, drying
and spraying with a moisture repellent.
6.20
6 • E
ECTION
S
P
HORE
OWER
P
I
OWER
NLETS
S
LECTRICAL
A soiled cable can be cleaned with grease-cutting
household detergent. A periodic application of vinyl
protector will help both ends and cable maintain their
original appearance.
It is imperative that the shore power outlet is dry
before plugging into the dock power inlet.
In case of salt water spray or immersion: Rinse
plug end and/or connector end thoroughly in fresh
water, shake or blow out excess water and allow to
dry. Spray with a moisture repellent before reuse.
20. S
ERVICING THE
D
ISTRIBUTION
NOTE: Servicing should be referred to a qualified
electrician.
A. T
R
O
EPLACE
T
M
D
HE
AIN
1.
Turn all breakers OFF.
2.
Make sure the generator is OFF.
3.
Unplug the shore power.
4.
Remove screws from all sides except the
hinged side of panel. The main distribution panel
is hinged to swing open for servicing.
5.
Reverse the procedure for closing the panel.
YSTEM
!
CAUTION
M
AIN
P
ANEL
A F
C
AULTY
OMPONENT
P
:
ISTRIBUTION
ANEL
®
(525 Sundancer
52 Sundancer
O
N
®
)

Advertisement

Table of Contents
loading

This manual is also suitable for:

525 sundancer

Table of Contents