Carrier Seal Kit - Sea Ray 52 Sundancer Owner's Manual

Table of Contents

Advertisement

S
ECTION
S
L
& S
S
HAFT
OG
TRONG
(F
. 4.13.1)
IG
SHAFT LOG
HULL
around the shaft and into the boat. Shaft
alignment and straitness must be correct to
assure proper operation of the Strong Seal
Refer to the Strong Seal
seal carrier kit in the Owner's Manual packet.
C. C
S
K
ARRIER
EAL
IT
Your 52 DA is equipped with spare carrier seals
located on the port and starboard engine shafts
(Figure 4.12.2). Seal failure can be corrected by
replacing the seal with the spare seals provided.
C
S
K
ARRIER
EAL
IT
(F
. 4.13.2)
SCREW
IG
SEAL
HOUSING
SHAFT LOG &
STRONG SEAL
PROPELLER SHAFT
T
R
C
O
EPLACE THE
ARRIER
1.
Clean any accumulated dirt and scale from the
exposed shaft. MAKE SURE THERE ARE NO
SHARP EDGES OR BURRS ON THE
SHAFT.
2.
Separate the two halves of the Carrier Seal Kit
housing by removing the screws. If there are
two lip seals in the carrier kit, move the forward
most one forward on the shaft until out of the
way.
®
52 Sundancer
(525 Sundancer
4 • B
ILGE
A
EAL
SSEMBLY
FLEXIBLE HOSE
information for the
CARRIER SEAL
SHAFT COUPLING
S
:
EAL
®
)
& U
NDERWATER
WATER
HOSE CLAMPS
INJECTION FITTING
STAINLESS STEEL
BANDS
3.
Remove the retaining ring from the Strong
Seal™ using a small screwdriver (for a
spiral ring) or snap-ring pliers (for a snap
.
ring). Work the retaining ring around the
new lip seal and move the ring forward out
of the way.
4. Reassemble the empty Carrier Seal Kit
housing onto the shaft just forward of the
new lip seal with the small diameter facing
aft. Leave the screws loose enough that
the housing can move along the shaft. The
Carrier Seal Kit housing is now ready to
be used as a lip seal installation tool.
5.
Push needle-nose pliers or a hook into the
exposed body of the lip seal and pull it out of
the Strong Seal
the shaft with wire cutters. BE CAREFUL NOT
TO SCRATCH THE SHAFT.
6.
Inspect and clean the inside of the Strong
Seal™ housing and the newly exposed area
of the shaft that was under the old lip seal.
7. Push the new lip seal and installation tool aft
until the lip seal contacts the Strong Seal™
housing. Using a rubber mallet, tap the face
of the installation tool until the lip seal is
seated within the Strong Seal™ housing. You
will know the lip seal is fully seated when the
retaining ring groove is exposed.
8. Remove the Carrier Seal Kit housing from
the shaft. Reinstall the retaining ring into its
groove in the Strong Seal™ housing.
9.
If the Carrier Seal Kit came with two lip seals,
position the remaining lip seal back onto a
convenient location on the shaft at least 2"
G
EAR
SEAL CARRIER KIT
STRONG SEAL
housing. Cut the old seal off
4.13

Advertisement

Table of Contents
loading

This manual is also suitable for:

525 sundancer

Table of Contents