Download Print this page

Huawei FusionServer Pro G5500 Routine Maintenance page 66

Advertisement

Installing a CPU in the G560 V5
Install the CPU and heat sink
1.
Take out the CPU protective cover.
2.
Use light to check the CPU socket pins from different angle to see whether there are
twisted pins or foreign objects.
3.
Align the two diagonal holes of the heat sink with the retaining clips on the CPU socket
and gently position the heat sink in place. Keep the assembly horizontal to avoid
damaging socket pins.
4.
Install a heat sink. Tighten the two diagonal screws (corresponding to 1 on the heat sink
label) on the heat sink. See (1) in figure on the right. Then tighten the two middle screws
(corresponding to 2 on the heat sink label). See (2) in the figure on the right.
Copyright © Huawei Technologies Co., Ltd. 2020
Page 66

Advertisement

loading