Page 1
Nano Box Installation Instructions Screen Innovations 9715-B Burnet Rd, Suite 400 Austin, TX 78758 120V AC - RTS 512.832.6939 www.screeninnovations.com INSTALLERS: Please leave this manual with the owner. 400026 v. 1.2 15 October 2019...
Page 2
PARTS LIST - NANO BOX - 120V AC - RTS SPACER BLOCKS AND LEVELING SHIMS (OPTIONAL) Spacer Blocks - used to clear an obstruction in the fabric path. Shades Wall Brackets (2) 375 Box 475 Box Screws Included (3 per Bracket) Connect spacer blocks to shade brackets before installation.
Page 3
INSTALLATION - NANO BOX - 120V AC - RTS INSTALLATION - NANO BOX - 120V AC - RTS 1. Install the wall brackets 4 - 6 inches in from the end of the shade with the supplied screws. 4. Hang shade onto wall brackets and center in the opening (The closer to the end of the cassette, the better) 4”...
Page 4
PROGRAMMING - RTS TROUBLESHOOTING - RTS Tech Support: 512.832.6939 Problem Possible Cause Action to Take PROGRAMMING STEPS (must follow in order) Warning: Do not Step 1: Fine tune lower limit For RTS attempt to use any Step 2: Assign shades to groups installation remote until all Have an electrician or approved personnel verify 120V Shade won’t operate.
Need help?
Do you have a question about the Nano Box and is the answer not in the manual?
Questions and answers