System Mounting - Pepperl+Fuchs 1001A Series Installation And Operation Manual

Type y or z purge / pressurization system
Hide thumbs Also See for 1001A Series:
Table of Contents

Advertisement

Model 1001A Installation and Operation Manual
IMPORTANT NOTES
The system should be mounted at EYE LEVEL.
Care must be taken to ensure the system and all protruding
components are clear of all enclosure accesses (doors and
covers) and conduit, pipe, tubing or cable entries.
LH, RH, TM, BM and WM confi gurations are intended for
mounting adjacent to the protected enclosure.
LH, RH, TM & BM confi gurations are also suitable
for 2" schedule 40 pipe mounting. In addition, these
confi gurations can be accessorized with an ECK (enclosure
connection kit). See page 8.
Systems furnished with the ECK are not compatible for
pipe mounting or multiple enclosure applications.
Determine the mounting confi guration of your system using
the diagrams on pages 9 and 10.
Remove and save the manila envelope (containing the
enclosure warning nameplate) which may be taped to the
outer surface of the mounting fl ange.
Although all systems are factory tested and calibrated, we
strongly suggest a bench test of basic functions prior to
installation.
Mounting LH, RH, TM, BM & WM Confi gurations
Surface mounting systems with ECK accessory
1. Verify dimensions of the system's mounting holes and
connection fi ttings in reference to the applicable drawing on
pages 9 and 10.
2. Upon confi rmation of dimensions, transfer mounting hole
pattern from drawing to the intended surface.
3. Check for internal obstructions that could hinder bolt
fastening and protective gas fl ow, drill and ream the
mounting holes before mounting the system.
4. Remove locknuts on enclosure connection fi ttings.
5. Secure the system to the protected enclosure using one
(1) SMK-1 mounting kit or equivalent - four (4) 1/4" x 3/4"
stainless steel bolts, nuts and lock washers.
6. Install the locknuts on the enclosure connection fi ttings from
inside of the protected enclosure, ensuring that fi ttings seat
directly against enclosure through the system mounting
plate fl ange.
Surface mounting systems without ECK accessory
1. Transfer hole pattern of system mounting plate to intended
surface.
2. Check for obstructions hindering bolt fastening, drill and
ream the mounting holes before mounting the system.
3. Secure the system to the enclosure, or other mounting
surface, using one (1) SMK-1 mounting kit or equivalent
- four (4) 1/4" x 3/4" stainless steel bolts, nuts and lock
washers.

System Mounting

Pipe mounting systems without ECK accessory
1. Locate 2" schedule 40 pipe, (vertical for LH & RH, horizontal
for TM & BM) within fi ve (5) feet of protected enclosure.
2. Ensure system is mounted in a true vertical position, secure
the system to pipe, using one (1) a PMK-1 mounting kit or
equivalent - two (2) 1/4" x 2" stainless steel "U" bolts, nuts
and lock washers.
Mounting FM & PM Confi gurations
HELPFUL HINTS
FM and PM confi gurations are designed to mount through
a panel cutout one (1) inch smaller than the overall height
and width of the system mounting plate, using clips and
fasteners provided with the SMK-4 or SMK-6 mounting kit.
This design feature eliminates the need to drill the system
mounting bolt holes in the protected enclosure.
FM confi gurations are intended for mounting adjacent to
the protected enclosure.
PM confi gurations are intended for mounting through a
cutout in the protected enclosure surface.
1. Transfer panel cutout pattern to the intended surface.
2. Check for obstructions that could prohibit bolt fastening or
system pneumatic connections.
3. Cut panel cutout pattern on the intended surface.
4. Deburr all cutout surfaces.
5. Secure system to enclosure using SMK-4 or SMK-6
mounting kit, or equivalent 1/4" x 3/4" stainless steel nuts,
bolts, mounting clips and lock washers.
7

Advertisement

Table of Contents
loading

Table of Contents