6 Operation
6.1 First Startup
The BÖWE Customer Service department is responsible for carrying out the first startup.
Attention: Before opening the switch panel or removing paneling,
set the main switch to "0".
6.1.1
Preparatory Work
Set up supply systems (electrical current, cooling water, compressed air, steam and condensate lines).
6.1.2
Filling Machine With Solvent
(Gas displacement procedure is mandatory)
See 6.2 (Automatic Operation - Brief Instructions) for information on turning the machine on.
Use only stabilized, high-purity TETRACHLORETHENE (perc), in accordance with DIN 53978.
The amount of solvent needed is:
Machine P25 Tank I:
Machine P30 Tank I:
Total filling amount P25:
Total filling amount P30:
Attention: Perc is a powerful fat solvent. Wear gloves when handling
perc and apply protective skin ointment to hands when done. Do not
smoke. If you get perc in your eyes, seek further medical care.
You must fill the pump with solvent before turning it on.
Check that the direction of rotation is correct.
approx. 120 l (approx. 195 kg) or
approx. 31.7 US gal (approx. 430.0 lb)
approx. 150 l (approx. 243 kg) or
approx. 39.6 US gal (approx. 535.8 lb)
approx. 600 l (approx. 972 kg) or
approx. 158.4 US gal (approx. 2143.3 lb)
approx. 600 l (approx. 972 kg) or
approx. 158.4 US gal (approx. 2143.3 lb)
14
703903-01-0
6
6.1
P25/P30