Final Checks And User Tips - Samsung AM FN1DEH Series Installation Manual

Hide thumbs Also See for AM FN1DEH Series:
Table of Contents

Advertisement

Final Checks and User Tips

36
To complete the installation, perform the following checks and tests to ensure
that the air conditioner operates correctly.
1
Check the followings.
 Strength of the installation site
 Tightness of pipe connection to detect a gas leak
 Electric wiring connections
 Heat-resistant insulation of the pipe
 Drainage
 Earth conductor connection
 Correct operation (follow the steps below)
After finishing the installation of the air conditioner, you should explain the fol-
lowing to the user. Refer to appropriate pages in the User's Manual.
1
How to start and stop the air conditioner
2
How to select the modes and functions
3
How to adjust the temperature and fan speed
4
How to adjust the airflow direction
5
How to set the timers
6
How to clean and replace the filters
Note
When you complete the installation successfully, hand over
the User's Manual and this Installation Manual to the user for
storage in a handy and safe place.

Advertisement

Table of Contents
loading

Table of Contents