Connect The Power Cable; Battery Switch; Making The Connection; Figure 46: Mounting Bracket Fastened Centrally - Geokon GeoNet 8900 Series Instruction Manual

Wireless data hosting system
Hide thumbs Also See for GeoNet 8900 Series:
Table of Contents

Advertisement

FIGURE 46: Mounting Bracket Fastened Centrally

F.5 CONNECT THE POWER CABLE
F.5.1 BATTERY SWITCH
Before connecting the power cable, be sure you have set the battery switch
appropriately, as indicated in Section 3.2.2.
When not using an external battery, set the battery switch inside the
Supervisor to the
BATTERY
When using an external battery between the solar panel and the Cellular
Gateway Supervisor, set the battery switch inside the Supervisor to the
setting.
9-24V

FIGURE 47: Solar Panel with External Battery

F.5.2 MAKING THE CONNECTION
Remove the plastic cap from the cable connector, then attach it to the
on the Cellular Gateway Supervisor. Tighten the retaining ring on the
for strain relief.
Note: Be sure to implement a drip loop, as indicated in the previous figure, to
prevent water ingress through the power connector.
MODEL 8900 SERIES GEONET WIRELESS DATA HOSTING SYSTEM | SOLAR PANEL KIT | 39
setting.
Drip Loop
46:
47:
plug
9-24V
plug,
9-24V

Advertisement

Table of Contents
loading

Table of Contents