3.2.2 POWER THE SUPERVISOR

Cellular Gateway Supervisors:
Move the battery switch to the
chart below. Connect to external DC power, then proceed to Section 3.2.3.
For solar panel information, see Appendix F.
Power Source
Domestic / Mains
Solar with external battery
Solar without external battery

TABLE 6: Cellular Gateway Supervisor Battery Switch Options

FIGURE 12: Cellular Gateway Supervisor Battery Switch

FIGURE 13: Non-Cellular Supervisor Battery Switch

Non-cellular Supervisors:
Move the battery select switch to either the
depending on the type of battery being used.
Align the positive (+) side of the batteries with the + indicator in the battery
holder. Push the batteries straight down into the holder.

FIGURE 14: Battery Detail

MODEL 8900 SERIES GEONET WIRELESS DATA HOSTING SYSTEM | NETWORK INSTALLATION | 11
setting or to
9-24V
BATTERY
Air Temp Less Than 0 °C
Air Temp Greater Than 0 °C
9-24V
9-24V
N/A
or
ALKALINE
, according to the
6:
BATTERY
N/A
BATTERY
12:
13:
position
LITHIUM
14: