Seal The Nodes; Record Node And Sensor Serial Numbers; Cellular Gateway Commissioning; Figure 19: Accessing The Cloud - Geokon GeoNet 8900 Series Instruction Manual

Wireless data hosting system
Hide thumbs Also See for GeoNet 8900 Series:
Table of Contents

Advertisement

16 | NETWORK INSTALLATION | GEOKON

3.5.4 SEAL THE NODES

Seal the Nodes using the instructions in Section 3.2.3.
Important! Make sure the cover seals tightly and evenly.
WARNING: Single-channel enclosure lids are square but are not symmetrical.
They are specifically oriented; improper installation could strip the threads and/
or allow moisture to enter the enclosure.

3.5.5 RECORD NODE AND SENSOR SERIAL NUMBERS

Record the serial numbers of the Nodes and of the sensors attached to the
Nodes.
For Multi-Channel Nodes, also note the channel to which each sensor has been
connected.

3.6 CELLULAR GATEWAY COMMISSIONING

For ease of setup, add all Nodes to the network before commissioning the
Supervisor.
Commissioning allows the cellular gateway to account for all of the Nodes in the
network. However, the cellular gateway cannot account for Nodes added to the
network after the commissioning process has been completed. Run the
commissioning process again whenever you have added new Nodes.
To commission the Cellular Gateway Supervisor, do the following:
1.
Display
https://api.geokon.com

FIGURE 19: Accessing the Cloud

2.
Click
"create
user".
3.
Enter your credentials and read/agree to the
in a Web browser.
terms of
service.
19:

Advertisement

Table of Contents
loading

Table of Contents