Configure The Supervisor; Power Concerns; Figure 11: Channel Select Switches; Table 5: Channel Selection - Geokon GeoNet 8900 Series Instruction Manual

Wireless data hosting system
Hide thumbs Also See for GeoNet 8900 Series:
Table of Contents

Advertisement

10 | NETWORK INSTALLATION | GEOKON
TO SET THE CHANNEL:
Move the channel select DIP switches (shown in the figure below) to any of the
twelve valid positions listed in Table 5 below. The setting will take effect at
power-up, or after the device is reset.

FIGURE 11: Channel Select Switches

Modbus Address and Channel
5:
1
2
3
4
5
6
7
8
9
10
11
12

TABLE 5: Channel Selection

3.2 CONFIGURE THE SUPERVISOR

3.2.1 POWER CONCERNS

In a new network, be sure to power the Supervisor before powering the Nodes.
When the unit is powered an LED on the right side of the box will flash twice,
indicating the unit has power. (The LEDs will not flash again until at least one
Node has joined the Network.)
Note: Deployment mode starts as soon as devices are powered on or reset. For
more information on Deployment mode, see Section 3.7.
Note: If replacing batteries in an existing network, ensure that the network is in
deployment mode prior to removing the batteries. See Section 4.3 for more
information on battery replacement.
1
2
3
OFF
OFF
OFF
ON
OFF
OFF
OFF
ON
OFF
ON
ON
OFF
OFF
OFF
ON
ON
OFF
ON
OFF
ON
ON
ON
ON
ON
OFF
OFF
OFF
ON
OFF
OFF
OFF
ON
OFF
ON
ON
OFF
11:
4
OFF
OFF
OFF
OFF
OFF
OFF
OFF
OFF
ON
ON
ON
ON

Advertisement

Table of Contents
loading

Table of Contents