Solenoid Valve Coil Replacement Procedure - Mitsubishi Electric PUHY-M200YNW-A1 Service Handbook

Table of Contents

Advertisement

[8-14 Hydro Unit Maintenance Instructions ]
8-14-8

Solenoid Valve Coil Replacement Procedure

Operation procedures
1) Remove the front panel (8 screws).
2) Remove the wires connecting the control
box and the solenoid valve coil.
3) Remove the screw from the coil cover, and
remove the coil cover and the coil.
4) Install the replacement solenoid valve coil
as shown in the figure, and connect it to the
control box connector.
BS_08_E
(1)
Solenoid valve coil
Service panel (front)
(3)
Illustrations
Solenoid valve coil cover
Solenoid valve coil
129
chapter 8 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents