Step 8: Roof Assembly
Part 3
D: With a helper, lift the Roof Assembly and place it onto the far right hand side of the Playhouse so that the
Roof Assembly sits flush with soffits. Attach the Roof Assembly from underneath the 4 corners using 4 (S20) #8 x
1-3/8" Wood Screws (Fig. 8.5, 8.6, 8.7, 8.8 and 8.9).
Fig. 8.5
Fig. 8.6
Fig. 8.7
Bottom View
Flush
Right
Side
Fig. 8.8
Fig. 8.9
S20
Bottom View
Hardware
4 x
#8 x 1-3/8" Wood Screw
S20
32