Figure 5
1. Tall 90° fitting
2. Short 90° fitting
4.
Assemble the tall 90° fittings into the extend
ports of the cutting-unit 6 and the cutting-unit 7
control valves
(Figure
5.
Align the 90° fittings as shown in
tighten the jam nuts.
Figure 6
1. Short 90° fitting
g321918
3. Retract port
4. Extend port
5).
Figure
6, and
g321917
2. Tall 90° fitting
3
Installing the Lift Cylinders
Parts needed for this procedure:
4
90° fitting (3/8 inch—tapered-pipe thread)
2
Lift cylinder
2
Cylinder rest
4
Capscrew (1/2 x 1-1/2 inches)
4
Tapered washer
4
Flange locknuts (1/2 inch)
4
Spacer tube
4
Cotter pin (3/16 x 1-3/4 inches)
2
Lift-arm stop
Preparing the Cylinders
Installer supplied material: #2 Permatex™ gasket
sealant
1.
Apply a coat of No. 2 Permatex gasket sealant
to the threads of the 4 90° fittings with 3/8 inch
tapered-pipe threads.
2.
Assemble the 90° fittings into the extend and
retract ports of the lift cylinders
preparing the lift cylinders
1. Lift cylinder (cutting-unit
position 7)
2. Lift cylinder (cutting-unit
position 6)
3.
Tighten the 90° fittings at a 45° angel to the body
of the cylinders as shown in
3
(Figure
7).
Figure 7
3. 90° fitting (3/8
inch—tapered-pipe
thread)
Figure
7.
g322284