Reorder P/N: UC4+BC+HG1-INST Rev H (Hagie STS12 2000-2004) NOTICE NORAC Systems International Inc. reserves the right to improve products and their specifications without notice and without the requirement to update products sold previously. Every effort has been made to ensure the accuracy of the information...
INTRODUCTION Congratulations on your purchase of the NORAC UC4+ Spray Height Control System. This system is manufactured with top quality components and is engineered using the latest technology to provide operating features and reliability unmatched for years to come. When properly used the system can provide protection from sprayer boom damage, improve sprayer efficiency, and ensure chemicals are applied correctly.
All parts supplied are selected will be inoperative until the installation is specially to fit the sprayer to facilitate a complete. Any installation procedure complete installation. However, NORAC requiring boom movement will need cannot guarantee all parts fit as intended to be done first.
HYDRAULICS FITTING KIT - HG1 446BC+MAN7 OPERATOR MANUAL UC4+ SPRAY HEIGHT CONTROL UC4+BC+HG1-INST MANUAL INSTALLATION UC4+ HAGIE STS12 44963D VALVE BLOCK ASSEMBLY 2 STATION CC/LS PROP DT 4 BOLT * For systems purchased BEFORE October 1, 2011, the roll sensor part numbers are 44641 and 44642.
Page 7
FACE P - PIPE The use of dielectric grease is not recommended on any NORAC electrical connections. To ensure all stainless steel hardware does not gall or seize apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation. Permatex...
Page 8
The parts that come with your UC4+ Spray Height Control system are shown below in their general installation configuration. Figure 2: UC4+ Spray Height Control Components...
INSTALLATION PROCEDURE 4.1 W ENSOR NSTALLATION 1. Assemble Breakaway Sensor c) Place the collar onto the angled tube Mounting Brackets (B13) as show in of the mounting base. Figure 4 and Figure 5. d) Install the spring between the collar and the upper ring of the base.
Page 11
4. Mount the NORAC UC4+ ultrasonic (Sensor Reading off Boom) sensor (E02) into the sensor brackets. General mounting rules for UC4+ The sensors should be oriented forward ultrasonic wing sensors: (ahead) of the boom (see Figure 6 and a) In its lowest position, the sensor Figure 8).
Page 12
Apply a light coating of the supplied Permatex Anti-seize grease to all threaded parts upon installation. Figure 9: Sensor Serial Number Installation Location...
4.2 M ENSOR NSTALLATION 1. Assemble the main lift sensor bracket General mounting rules for ultrasonic (B11) as shown in Figure 10. main lift sensor: a) Mount the sensor at the midpoint of the Sensor Mounting main lift section. Collar b) The sensor must have a 12-inch Bracket Tube diameter clear view of the ground...
4.3 R ENSOR NSTALLATION To mount the roll sensors, the roll sensor When mounting the roll sensors use the brackets will have to be bent. The brackets following guidelines and refer to Figure 14. are supplied with a 90° bend and must be 1.
Chassis Roll Sensor Boom Frame Roll Sensor Figure 14: Mounting Guidelines The roll sensors must be mounted with the Amp connectors pointing to the right. Figure 15: Roll Sensor Mounting with Respect to Sprayer Orientation 4.3.1 Boom Roll Sensor Mounting 2.
4.3.2 Chassis Roll Sensor Mounting The chassis roll sensor must be attached to 2. Cable-tie the bracket to a square edge the chassis of the sprayer. To mount the (square tube). chassis roll sensor, refer to the following 3. The AMP (circular) connector must exit guidelines.
NORAC hydraulic Valve (V01) (Figure 18). Figure 19: Valve Block Assembly 6. Bolt the NORAC valve block to the mounting bracket (B10). 7. Remove the two bolts holding the Hagie valve block in place on the right side of the center rack.
"B" ports of the NORAC valve block. The ports on the sprayer block must then be capped with 6MBP plugs (F09). 3. The "A" ports of the NORAC block must be connected to the “lower” lines of the cylinders. The ports on the sprayer block must then be capped with F09.
4.5 E LECTRICAL NSTALLATION 2. Follow Figure 2 and Figure 22 to 1. Install the UC4+ Control Panel (E01) in connect the UC4+ cabling. the cab of the sprayer. Mount the panel where it will be clearly visible and within 3.
1. Start up your sprayer and test the 10. Connect the 2-pin connectors on C03 sprayer’s functionality. The NORAC to the NORAC valve block. Control Panel does not need to be powered up for the original switches to 11. The connectors on the valve cable function.
Page 26
Canada NORAC Systems International Inc. CALL TOLL FREE: 1-800-667-3921 (306)664-6711 SHIPPING ADDRESS: 3702 Kinnear Place Saskatoon, SK S7P 0A6 United States NORAC, Inc. CALL TOLL FREE: 1-866-306-6722 (952)224-4142 SHIPPING ADDRESS: 6667 West Old Shakopee Road, Suite 111 Bloomington, MN...
Need help?
Do you have a question about the UC4+ and is the answer not in the manual?
Questions and answers