SAT (Site Acceptance Test) date.
•
Location remarks (any special remarks about the site, e.g. behind a gate, no pho-
to cameras allowed etc.)
•
Add a picture of the surrounding of the charger, upload the local CAF document
A4 on the page of the charger in PDF
•
Change Deliver status to <SAT>.
After completing the Site Acceptance Test, ABB's Network Operation Center will be trig-
gered to perform a final check on the connection and configuration of the charger.
Upon approval the charger will be operational and initialized for use.