1. Slide the cable inside the grommets, ensure at least 10mm of cable external jacket
inside the box (see notes at the end of this §, Before sliding the cable inside the grom-
met).
2. Push the cables back through the gland plate, until sufficient cable length is left to
reach the cable terminals, make sure the PE cable is longer than the other cables.
3. Tighten the strain relief.
4. Slide the cable cover and screw the two screws
2 2 -O CT -19
T ERRA D C WA LLBO X
27 /40