Feed Pipe Clamp Assembly; Opening The Cable Trays - Hardi BOOM TERRA FORCE Instruction Book Supplement

Hide thumbs Also See for BOOM TERRA FORCE:
Table of Contents

Advertisement

6 - Maintenance

Feed pipe clamp assembly

A feed pipe can be removed from the pipe clamps the following way:
1. Use a flat bladed screwdriver to prize the cover off the first corner
(A).
2. Hold the clamp top with your hand and prize off the opposite
corner (B) with the screwdriver.
3. Prize off the other side of the pipe clamp with the screwdriver.
4. Take out the feed pipe.

Opening the cable trays

The cable trays on the boom can be opened for servicing or re-wiring.
Disassembly
1. Use a screwdriver at the end of a cable tray to prize the cable
tray cover off the lock hooks.
2. Pull the cable tray cover off.
Assembly
1. Press the cover on by hand until it hits the hooks of the cable
tray.
58

Advertisement

Table of Contents
loading

Table of Contents