Page 1
TWIN BOOM Air bag Original Mounting Instruction 67218400-100, version 1.00 GB - 06.2018 www.hardi-international.com...
Page 2
We congratulate you for choosing a HARDI plant protection product. The reliability and efficiency of this product depend upon your care. The first step is to carefully read and pay attention to this mounting instruction. It contains essential information for the efficient use and long life of this quality product.
Instructions Before Mounting Mounting Kit The delivered parts are to be mounted on your HARDI sprayer. They are used for leading the air from the TWIN blowers to the air channels on the boom wings. Where on the Sprayer On the boom wings.
Instructions Mounting Instructions Mounting the Parts Prepare the aluminium rails by applying sliding agent. This will facilitate pulling the air bags onto the rails. Start with mounting the air bag at the boom tip (breakaway), and work you way towards the boom centre. Note what is the inside and outside of the air bags before mounting.
Page 5
Instructions When mounting an air bag, lead the string into the channel in the aluminium profile. Push it forward by hand while making sure that the air bag does not exit this channel anywhere. Get a colleague to help pulling the air bag on to the air channel. Use steel hooks in the air bag straps for easier handling.
Page 7
Instructions Between the breakaway and outer boom section, ensure that the air holes in the air bag is fitted precisely in line with the air holes in the air channel.
Page 8
Instructions Tie the strings in a knot using the black brackets. At the end of the boom, tie a knot and put on a metal clamp.
Page 9
Instructions Use sharp pliers to fasten the metal clamps. At the positions for boom folding, the air bag is attached like this. Do not tie the strings by crossing over the boom folding point, or over to another boom section, as this will cause the strings to break during use.
Page 10
Instructions Tie the air bag to the boom below the folding joints.
Page 11
Instructions The air bag for the breakaway is mounted on the outside of the next air bag. Tie the two air bags together with an elastic string.
Page 12
Instructions Melt the ends with a lighter to prevent fraying of the strings.
Page 13
Instructions Cut elastic strings in lengths of 400 mm. Place the strings like this.
Page 14
Instructions Tie the strings together to pull the air bag upwards. The clearance between the lower part of the air bag and the boom should be 5 centimetres. Tie the air bag to the top of the boom like this.
Page 15
Instructions Lead the string below the folding joints.
Page 17
Instructions Boom, 33 meters: An extra air bag piece is mounted on the breakaway with velcro bands.
Page 18
Instructions Connect the air bag to the TWIN blower. Fasten the air bag with the black clamp ring. The ring must sit below the elastic string inside the air bag. Tie the elastic string in a knot, after the black ring is tightened. Mounting completed.
Page 19
2. Select “HARDI” in the menu on the left. 3. Select “Spare parts catalogue” and find your spare part. 4. Online ordering is also possible. 5. Contact your HARDI dealer for further information on spare parts. User Evaluation Dear Reader, We update our mounting instructions regularly.
Need help?
Do you have a question about the TWIN BOOM and is the answer not in the manual?
Questions and answers