Commissioning

7.1

Reference to chapter Safety instructions

Observe the following when carrying out any work on the machine:
• Comply with the general safety instructions (Page 11).
• Comply with the applicable national and sector-specific regulations.
• When using the machine within the European Union, comply with the specifications laid
down in EN 50110‑1 regarding safe operation of electrical equipment.
Note
Service Center
Please contact the Service Center (Page 113) if you require commissioning support.
7.2

Measures before commissioning

Risk of losing the IP degree of protection as a result of damaged shaft sealing rings
This can result in death, serious injury, or material damage.
• Replace damaged components immediately.
7.2.1

Checks to be carried out prior to commissioning

The following list of checks to be performed prior to commissioning does not claim to be
complete. It may be necessary to perform further checks and tests in accordance with the
specific situation on-site.
Once the system has been correctly installed, you should check the following prior to
commissioning:
• The machine is undamaged.
• The machine has been properly installed and aligned.
• The output transmission elements are set correctly for their type,
e.g. alignment and balancing of couplings, belt forces in the case of a belt drive, tooth forces
and tooth-flank backlash in the case of geared output, radial and axial clearance in the case
of coupled shafts.
• All fixing screws, connection elements, and electrical connections have been tightened to
the specified tightening torques.
1FU9
Operating Instructions, 07/2020, A5E46712792A
7
71