Installing clock cables - OptiX OSN 9560 and OptiX OSN 7500
A
NOTE
The 75-ohm and 120-ohm clock cables are available.
The OptiX OSN 9560 supports input and output of 75-ohm and 120-ohm clock signals. However, 75/120-ohm clock transit
cables are required if the external ports that output clock source signals use 75-ohm connectors because STI boards on the
OptiX OSN 9560 provide only 120-ohm RJ45 connectors.
The OptiX OSN 9560 uses 120-ohm clock cables by default. If an OptiX OSN 9560 connects to an OptiX OSN 3500, use 120-
ohm clock cables to connect them. Clock cables between subracks can be made using network cables on site.
The 120-ohm clock cables must be shielded wires without cable sheaths.
B
C
Outputting
clock signals
A
EOW board
75-ohm clock input
75-ohm clock output
120-ohm clock
input/output 1
B
Connected to
the CLK1 port
Connected to
the CLK2 port
Clock Cable Connections
X1
X2
1
4
2
5
3
7
6
8
4
1
5
2
7
3
8
6
31
AUX board
75-ohm clock input
75-ohm clock output
120-ohm clock
input/output 2
C
Outputting
clock signals
Color
Relationship
White/Blue
A twisted pair
Blue
White/Orange
A twisted pair
White/Green
Green
A twisted pair
Orange
White/Brown
A twisted pair
Brown

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optix osn 3500Optix osn 7500

Table of Contents