5
Installing Ground Cables for the Power Distribution Box and Subracks
Phillips screwdriver
Ground cable
M6
50±5 Kgf.cm
To ground the lower subrack, connect one cable terminal to a ground screw on the inside column and connect the
other terminal to a ground screw on top of the subrack.
Use the same method to ground the upper subrack.
20