Installation Process - Huawei OptiX OSN 9560 Quick Installation Manual

Intelligent optical transmission system
Table of Contents

Advertisement

Installation Process

Installing Subracks
Pages 5 to 8
Installing CRPC
Page 9
Plug-in Frames
Installing Fiber
Page 10
Management Trays
Before You Start
Page 1
Page 2
Page 3
Page 4
Pages
5 to 10
Pages
11 to 36
Pages
37 to 40
Pages
41 to 42
Page 42
Pages
43 to 44
Start
Precautions
Precautions About
Board Operations
Installation Tools
Introduction to the
OSN 9560 Equipment
Installing Components
Installing and Laying
Out Cables
Installing and Laying Out
Fibers
Checking the Installation
Checking Fiber
Attenuation
Attaching Engineering Labels
End
Cable Holes on the Top
Page 11
and Bottom of the
N63E Cabinet
Installing and Laying Out
Pages
Power Cables: DC Power
12 to 13
Distribution Box
Power Cable Connections
Pages
Between the Cabinet and
14 to 17
Subrack
Installing and Laying Out
Pages
Power Cables and
18 to 19
PGND Cables
Installing Ground Cables
for the Power Distribution
Page 20
Box and Subracks
Pages
Cabinet Power Ports and
Subrack Power Ports
21 to 23
Pages
Installing and Laying Out
24 to 25
NMS Cables
Pages
Installing and Laying Out
26 to 27
External Alarm Cables
Pages
Installing and Laying Out
28 to 29
Cabinet Indicator Cables
Pages
Installing and Laying Out
30 to 31
Clock Cables
Installing and Laying Out
Page 32
CRPC Cables
Installing and Laying Out
Page 33
Cables in the Subrack
Interfacing Area
Pages
Installing and Laying Out
34 to 35
E1 Cables
Installing and Laying Out
Page 36
F1 Serial Port Cables

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optix osn 3500Optix osn 7500

Table of Contents