Figure 7.19 Supply Sensor Positioning - Carrier Transicold 69NT40-561-001 Operation And Service Manual

Container refrigeration units
Hide thumbs Also See for Transicold 69NT40-561-001:
Table of Contents

Advertisement

13. Position sensor in unit (see
14. Reinstall sensor (see
The P5 Pre-Trip test must be run to deactivate probe alarms (see
7.24.3
Sensors STS and SRS Reinstallation
To properly position a supply sensor, the sensor must be fully inserted into the probe holder mounting clamp. See
Figure
7.19. Do not allow heat shrink covering to contact the probe holder. For proper placement of the sensor, be
sure to position the enlarged positioning section of the sensor against the side of the mounting clamp. This position-
ing will give the sensor the optimum amount of exposure to the supply air stream, and will provide accurate tempera-
ture readings to the controller.
11
10
9
8
1) Supply Air Stream
2) Insulation
3) Back Panel
4) Supply Sensor
5) Mounting Clamp
6) Sensor Wires
7) Drip Loop
Figure
7.18) and re-check sensor resistance.
Section
7.24.3).

Figure 7.19 Supply Sensor Positioning

1
2
3
4
5
6
7
(2.5")
NOTE
Section
5.9).
8) Gasket Mounting Plate
9) Gasketed Support Plate
10) Gasketed Cover
11) TIR Bolts
12) STS Probe
13) SRS Probe
- - - - -
7–33
12
13
T-340

Advertisement

Table of Contents
loading

This manual is also suitable for:

Transicold 69nt40-561-199

Table of Contents